The Lady Eleanor Holles School

Client: The Lady Eleanor Holles School
Architects: Scott Browning

New leisure facilities including part refurbishment of existing swimming pool and existing classrooms. Estimated construction value: £6.7M. Due for completion in 2017.

Bosco College

Client: Bosco College
Architects: BDP.
Client Representative: Synergy

MEP Quality and Compliance role throughout the design and construction stages.

Tonbridge School

Client: Tonbridge School
Architects: ORMS

Phase refurbishment of ten year master plan. First three phases of Old Big School, Dryhill House and now Divinity building under construction. Phased PC during 2012 and 2013.

Tonbridge School

Great Marlow Academy

Client: Clipston Construction Control via Buckinghamshire County Council Framework
Architects: Jonathan Holland Architects

The build of a new Drama / Music Block with a two storey multi-use Drama space. A new build 4 classroom block for a new 2FE intake. Works within the Main School building for additional Break Out Spaces and Staff room.

Great Marlow

St George’s Medical Training School

Client: St Georges MS
Architects: John Sharkey & Co

Long term planned preventative maintenance programme; Hunter Wing refurbishment.

Tonbridge School Education

London Guildhall University

Client: London Guildhall University

Moorgate lecture theatres refurbishment. Whitechapel Road Condition survey 100 Minories air conditioning refurbishment and boiler upgrade.Thermal scan survey and electrical load analysis of 8No. buildings.

Leith’s School of Food and Wine

Client: Prue Leith 
Architects: Huw Owen Architects

Refurbishment of lecture theatres, kitchen, changing rooms.

St Pauls Catholic College

Client: Catholic Diocese
Architects: FM Modern Design

New build £16m college of 1200 students capable of expanding to 1600.

North East Surrey College of Technology

Client: North East Surrey College of Technology
Architects: Ideas First Design

Refurbishment of central wing of main block.

Waverley Abbey C of E School

Client: The Church of England
Architects: Jonathan Holland Architects

Was to be a prototype school of the future. The main structure was to be a "Shed type" building. The teaching areas would be Pod type structure, stacked on top of each other, with the MEP services factory built and each Pod would "plug and play" into the Shed's MEP infrastructure. So that as teach method and trend change over time, the Pods can be removed and remodeled to suit the new usage.

Waverley Abbey

Lent Rise Junior School

Client: Clipston Construction Control via Buckinghamshire County Council Framework
Architects: Jonathan Holland Architects

Conversion of Dry Changing Area into additional Classroom for 1FE intake.

Extension to existing Hall / Dinning area for additional intake.

New build Main School Reception school office and refurbishment of 3 classrooms for new 1.5FE intake.

Lent rise

Turnfurlong Infant School

Client: Clipston Construction Control via Buckinghamshire County Council Framework
Architects: Jonathan Holland Architects

The build of a new School Hall and Dinning Area with all new Infrastructure for MEP services. And the conversion of the existing School Hall into 2 new Classroom for an additional 1FE for the school intake.

Turnfurlong Infant School

Eastbury Comprehensive School

Client: London Borough of Dagenham
Architects: John Sharkey & Co.

Condition survey and planned preventative maintenance survey.

Torriano Infant School

Client: London Borough of Camden
Architects: Curl La Tourelle

Preparation of Environmental Study in order to address heating, glare and ventilation concerns.

National History Museum Extension

Client: National History Museum
Architects: CF Moller

Assisting Manly Project Management during the construction stage with the MEP Services.

Lawes’s Research Centre, Rothamstead

Client: ICAR
Architects: Ainsworth Davey Partnership

New conference and training centre and dining facility for the Research Centre. 

London School of Economics, Portugal Street

Client: London School of Economics
Architects: John Sharkey & Co.

Condition Survey.

Mid-Kent College, Maidstone

Client: Mid Ken College
Architects: John Sharkey & Co.

Condition Survey and report city way site, 10 blocks and Oakwood site, 13 blocks no Plc.

Kentish Town Primary School

Client: London Borough of Camden 
Architects: Curl La Tourelle

Refurbishment of school with studies prepared for the integration of solar panel and PV technology.

Rockmount Primary/Infant/Nursery School Amalgamation

Client: London Borough of Croydon
Architects: ECD Architects

Rationalisation and renewal of MEP Services.

Welfare Road School

Client: The TCES Group
Architects: GA Architects

East London Independent School.

General MEP services refurbishment.

The Highcrest Academy, High Wycombe

Client: Buckinghamshire County Council
Architects: Jonathan Holland Architects

Demolish and rebuild new Dining Hall Block, new Science Block, new Sixth Form Block and new Sports Hall.