Flemings Mayfair Hotel

Client: Flemings Mayfair Hotel
Architect: Reardon Smith Architects

Condition survey and preparation of detailed MEP Services in support of an informed Planning Application for a single storey vertical extention, rationalisation and refurbishment of a number of existing bedrooms to be undertaken whilst the hotel remains in occupation.

Hotel Leeds Arena

Client: Private
Architect: Dexter Moran Associates

Completion of a 120 bed grade 4 hotel in prime location.

Due for opening: 1st November 2017

leeds arena

No. 11 Cadogan Gardens

Client: Cadogan Estates
Architect: Reardon Smith Architects

A phased refurbishment of 56 guest rooms including conversion and rebuilding of 12 smaller rooms into 6 suites and the full refurbishment of the Guinness and Cadogan Suites. Light refurbishment of the remaining bedrooms. 

Conversion and rebuilding of basement areas to incorporate administration and other staff facilities and refurbishment of Reception and public rooms in the ground floor and basement without decanting.

 

Richmond Golf Club

Client: Richmond Golf Club
Architect: GHK Architects

Comprehensive MEP condition survey and report for phased master plan refurbishment and extension. Gentlemen's changing room and associated areas due for completion mid-2016.

Hilton Doubletree Hotel, St Albans

Client: Sculpture Real Estate
Architect: AFL

A new-build 170 bedroom Hilton Doubletree hotel with conventional leisure facilities, fine dining, etc. adjacent to M25.

Construction will commence early 2016.

Hilton Doubletree Hotel, Cambridge

Client: Hilton Doubletree
Architect: Infinity Architects

Additional third floor comprising of sixteen bedrooms without decanting commencing on site early 2016.

St John Hotel & Restaurant

Client: St John Hotel
Architects: GMW Architects

Conversion of a restaurant and modification into a 14 bedroom hotel.

Aqua Restaurant, Regent St, London WC1

Client: Aqua Group London
Architects: Yfbs

The fit-out of top floor of the former Dickens & Jones Department store in Regent Street providing 300 covers plus bar area.

The 17,000 sq ft area comprises two Restaurants (Japanese and Spanish Tapas) and a Cocktail bar.

The project was completed in September 2009.

The Third Space Marylebone

Client: The Third Space
Architects: Goldstein Ween Architects

The fit-out of the Health & Fitness Facilities at the Marylebone site, with state of the art body sculpting apparatus and relaxation therapy, completed April 2011.

The Third Space

Client: The Third Space
Architects: Goldstein Ween Architects

The fit-out of Soho (completed 2009) and Marylebone (due for completion early 2011) Health & Fitness Facilities with state of the art body sculpting apparatus and relaxation therapy.  

Wildernesse Golf Club, Sevenoaks

Client: Wildernesse Golf Club
Architect: HWK Architects

Ten year phased master plan refurbishment and development commencing 2016.

Hotel Cannizaro House, Wimbledon

Client: Hotel Cannizaro House
Architects: Carey Jones Architects

Phase refurbishment over ten year period.

Brooklands Race Track

Client: Brooklands Race Track

MEP Services for the historical bus museum.

Walton Heath Golf Club

Client: Walton Heath Golf Club

Architect: W.J. Maskell Associates

Proposed new club house building - Incoming MEP services details.

Down Hall Hotel, Bishops Stortford, CM22 7AS

Client: Down Hall Hotels

Architect: Reardon Smith Architects

General MEP incoming services upgrade - General refurbishment of boiler room and associated plant equipment.